Periwinkle showing the 'spray-rail' effect of the plank laps.... |
...and Phoenix III doing the same |
The structural benefits of the overlapping planks mean that a lapstrake hull can (within limits) be built with reduced internal framing, and in the case of 'Phoenix III' I specified no transverse framing from the semi-bulkhead at the forward end of the centreboard case through to the bulkhead at the forward end of the stern seat (i.e. 'sternsheets') - a distance of 2280mm or 7-1/2 feet. However, there is other structure present in the form of a substantial transverse thwart structure, the keelson, and the centreboard case.
I had some minor misgivings about whether I was taking the matter of a structurally clean interior to an extreme, but until very recently I have had no reports of problems. In fact, the very first Phoenix III built is now more than nine years old, and has been used heavily, going on the water weekly for that entire time, and having travelled long distances on a trailer (trailers damage boats more than anything else).
Despite the lack of structural problems reported, in 2007 I placed this entry into the instruction manual which accompanies the plans:-
Planking
One of the design
aims with Phoenix III was to have a
clean and uncluttered interior. This has the benefit of making sanding and
painting easier, makes cleaning easier, and produces a smooth interior hull
surface for sleeping aboard.
Another design aim
was to make the boat as light as possible. The lighter a trailer boat is, the
more she will be used. The clean and frameless interior is in line with the
quest for light weight.
There
are no transverse floor timbers (frames) specified in the plans between the
half-bulkhead at the forward end of the centerboard case, and the half-depth
bulkhead at the forward end of the stern sheets (seat). Between these two
points, the hull relies upon the strength of the planking, the glued plank
laps, the keelson (or hog), the centerboard case, and the main thwart.
The
resulting structure is strong, clean, and slightly springy. But, it is
very important that the builder pays close attention to the standard of gluing
– particularly along the plank laps. Use of epoxy fillets along the internal
lap lines will prevent water sitting in the laps, and will add considerable
strength to the joint. This is only really important in the lower planks.
For
those who prefer additional strength, or who need a base upon which to place
raised floorboards, transverse floor timbers can easily be added during
construction. Consult one of the suggested test books, or contact me for details. My preference would be for bent floor timbers
(steam-bent if necessary) glued across the top of the keelson, extending out to
cover the first two laps. Size is arbitrary, but I would be thinking of 9mm
x 22mm/ 3/8” x 7/8” as recommended by
John Brooks for his design, ‘Ellen”.
When Woodenboat Magazine asked me to write a 'How to Build' article about 'Phoenix III', I re-drafted the plans to make them better suited for magazine publication, and while I was at it, I drew a pair of half frames to go under the main thwart, on either side of the centreboard case. That would deal with any lingering concerns about the expanse of unsupported planking once and for all, but at the expense of the clear interior.
Now, having told this overly long story, I have to tell you that my customer and friend (email friend, that is - we live on opposite sides of the globe) Jonathan McNally, has reported a persistent cracking problem in the joint between the garboard strake (i.e. the plank closest to the keel) and the keelson on his 'Phoenix III'. Jonathan's boat was built without any extra framing structure, and is a good example of the 'pure' original design. The cracking is minor, but it does indicate a potential problem - as I had feared.
Very fine crack in the paint work on Jonathan's boat just above the keelson in this photo |
Jonathan believes that the cracking was initiated by heavy foot-falls on the planking, and he intends to put in some steam-bent ribs and light floorboards to distribute human foot pressure. This is very similar to my comments listed above in the except from my building instructions.
I'm hoping that this whole business is a case of me worrying too much, as nobody else has told me of the problem. I asked Jonathan about the eopxy products used, and they were all perfect for the job. However, the plywood came from a very highly regarded European manufacturer, but there is a twist. A very good friend of mine who is a Naval Architect conducted engineering tests on a range of plywoods on the Australian market, one of which was this fancy European brand. The results of the testing were surprising. This particular 'super high quality' ply came out as:-
- lowest bending strength;
- lowest peak load at breakage;
- lowest modulus of elasticity;
- lowest strength-to-weight ratio;
- 2nd lowest stiffness-to-weight ratio;
- lowest structural efficiency (adjusted)
So, many lessons to be learnt. If building a 'Phoenix III', I am now changing the status of the two half frames under the main thwart from, 'Optional' to 'Recommended', even if they may not really be required.
I gave this great blog post a bit of thought today. I do think the 3/8 X 7/8" steamed frames would add aesthetically (in addition to structurally, of course), but given the movement riveted or clenched frame fasteners makes sense. The analysis of the suspect plywood is a useful addition as a closer look at the photo above indicates that the location of the failure is at the upper edge of the fillet. In addition to plywood quality, a thicker garboard might be another possible tack. Finally, experiences of mine rebuilding boats that have employed 3M's 5200 adhesive are memorable. I recall one 40' pitch pine plank hanging by a bead of 5200! The 5200 had been hastily applied to severely leaking carvel seams over wet, old wood just to keep the old girl afloat. When it came time to remove the plank I saw just how amazing that stuff can be in certain applications. So, at least for your garboards, I might suggest using 5200 with light clamping pressure to ensure a healthy adhesive layer. It's not as convenient as epoxy in this application, but might be more ideal for the flexing of those lower planks. Just my $0.02
ReplyDeleteI have experienced slight plank flexing aft of the centreboard case but only on occasions where the boat and rig were both under stress in heavy reaching conditions fun at the time but I also noted a marked increase in heart rate. Scotts comment about maybe a thicker garboard plank has merit to stop this flexing, frames would detract from one of the best aspects of the boat, uncluttered floor easy to clean and maintain. When I built my boat I used West Epoxy did not pre coat the ply as a lot of builders do today. When gluing I mixed the resin primed the surface to be glued then mixed the 406 Colloidal Silica with the remaining resin and applied it to the wet primed surface. I see now that there is premixed epoxy adhesive while I have never used this glue to my way of thinking the priming with resin then applying adhesive to the wetted surface seems to make a better bond. Another $0.02 worth.
ReplyDeleteFurther to my previous post I built my PIII in 2006
ReplyDeleteThe matter of pre-coating is something that I really want to discuss, so I'm going to write a blog post about it tomorrow night - I just haven't got time now as it is late in Australia and I have a very early job commitment in the morning. However, pre-coating and/or exceeding 'chemical bonding' windows is a real problem with wood/epoxy construction, and I DO NOT use the practise when I am building.
ReplyDelete...on the other hand, priming the surfaces before applying pre-mixed epoxy adhesive is absolutely essential - in fact it is insisted upon by the manufacturer of the epoxy I use.
ReplyDeleteWhat brand of plywood was used in the boat built by Jonathan?
ReplyDelete